参考文献
[1]Zurawski R.Industrial Communication Technology Handbook[M].2nd ed.[S.l.]:CRC Press,2013.
[2]Studnia I,Nicomette V,Alata E,et al.Security of Embedded Automotive Networks:State of the Art and a Research Proposal[Z].2013.
[3]Kellerman G,Nemeth D,Kostelezky D,et al.Electrical and Electronic System Architecture[J].Atzextra Magazine,2008,13(8):3037.
[4]王志颖,马卫东,熊光泽,等.面向安全关键系统的CAN总线应用研究综述[J].计算机系统应用,2011,28(4):12161220.
[5]Lin Chungwei,Zhu Qi,Phung C,et al.Securityaware Mapping for CANbased Realtime Distributed Automotive Systems[C]//Proceedings of International Conference on Computeraided Design.New York,USA:ACM Press,2013:115121.
[6]Sandstrom K,Norstrom C,Ahlmark M.Frame Packing in Realtime Communication[C]//Prodeedings of International Conference on Realtime Computing Systems and Applications.Washington D.C.,USA:IEEE Press,2000:399403.
[7]Saket R,Navet N.Frame Packing Algorithms for Automotive Applications[J].Journal of Embedded Computing,2006,2(1):93102.
[8]Polzlbauer F,Bate I,Brenner E.Optimized Frame Packing for Embedded Systems[J].IEEE Embedded Systems Letters,2012,4(3):6568.
[9]Tindell K W,Hansson H,Wellings A J.Analysing Realtime Communications:Controller Area Network (CAN)[C]//Proceedings of Realtime Systems Symposium.Washington D.C.,USA:IEEE Press,1994:259263.
[10]Davis R,Burns A,Bril R J,et al.Controller Area Network(CAN) Schedulability Analysis:Refuted,Revisited and Revised[J].Journal of Realtime Systems,2007,35(3):239272.
[11]Mary G I,Alex Z C,Jenkins L.Response Time Analysis of Messages in Controller Area Network:A Review[EB/OL].(20121212).http://www.hindawi.com/journals/jcnc/2013/148015.
[12]Hansson A,Nolte T,Norstrom C,et al.Integrating Reliability and Timing Analysis of CANbased Systems[J].IEEE Transactions on Industrial Informatics,2002,49(6):12401250.
(下转第52页)
(上接第33页)
[13]Gujarati A,Brandenburg B B.When is CAN the Weakest Link?A Bound on FailuresinTime in CANbased Realtime Systems[C]//Proceedings of the 36th IEEE Realtime Systems Symposium.Washington D.C.,USA:IEEE Press,2015:112.
[14]Mary G I,Alex Z C,Jenkins L.Reliability Analysis of Controller Area Network Based Systems——A Review[J].International Journal of Communication Network and System Sciences,2013,6(4):155166.
[15]Polzlbauer F,Bate I,Brenner E.On Extensible Networks for Embedded Systems[C]//Proceedings of IEEE International Conference on Engineering of Computer Based Systems.Washington D.C.,USA:IEEE Press,2013:6977.
[16]Schmidt K W.Robust Priority Assignment for Extending Existing Controller Area Network Applications[J].IEEE Transactions on Industrial Informatics,2013,10(1):578585.
[17]郝勃,刘衍珩,曲良东,等.CAN网络的分组合并策略研究及实现[J].仪器仪表学报,2012,33(9):21372143.
[18]Xie Yong.Worstcase Response Time Analysis for Messages in Controller Area Network with Gateway[J].IEICE Transactions on Information Systems,2013,96(7):14671477.
编辑顾逸斐 |