参考文献
[1]Shin S,Kyoung P,Keun J O,et al.Multi-objective FMS Process Planning with Various Flexibilities Using a Symbiotic Evolutionary Algorithm[J].Computers & Operations Research,2011,38(3):702-712.
[2]Kim Y K,Kim J Y,Shin K S.An Asymmetric Multileveled Symbiotic Evolutionary Algorithm for Integrated FMS Scheduling[J].Journal of Intelligent Manufacturing,2007,18(6):631-645.
[3]Zhang Peng,Liu Hong,Ding Yanhui.Dynamic Bee Colony Algorithm Based on Multi-species Co-evolution[J].Applied Intelligence,2014,40(3):427-440.
[4]Fister I,Strnad D,Yang Xinshe,et al.Adaptation and Hybridization in Nature-inspired Algorithms[J].Adaptation Learning & Optimization,2015,18(10):3-50.
[5]姜明佐,张新立,吴涛,等.基于云控制的混沌多种群自适应遗传算法[J].计算机工程,2014,40(1):186-190.
[6]Shin K S,Jeong Y S,Jeong M K.A Two-leveled Symbiotic Evolutionary Algorithm for Clustering Problems[J].Applied Intelligence,2012,36(4):788-799.
[7]吴宏晓,侯志俭.共生进化免疫神经网络在电力系统短期负荷预测中的应用[J].华东电力,2004,32(12):11-14.
[8]张军,郑浩然.具有行为强化学习能力的人工生命进化模型设计[J].计算机工程,2000,26(10):11-13.
[9]姚志红,费敏锐,孔海南.基于多元共生遗传神经网络的藻类预测仿真[J].系统仿真学报,2008,20(2):480-484.
[10]张勇军,任震,钟红梅,等.基于灾变遗传算法的无功规划优化[J].电力系统自动化,2002,26(23):29-32.
[11]Beatrice M O,Mario V.Local Search Genetic Algorithms for the Job Shop Scheduling Problem[J].Applied Intelligence,2004,21(1):99-109.
[12]Moon I,Bae S L H.Genetic Algorithms for Job Shop Scheduling Problems with Alternative Routings[J].International Journal of Production Research,2008,46(10):2695-2705.
[13]Giovanni L D,Pezzella F.An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling Problem[J].European Journal of Opera-tional Research,2010,200(2):395-408.
[14]苏兆锋,邱洪泽.求解柔性作业调度的共生进化算法[J].计算机工程,2008,34(1):204-206.
[15]刘益剑,方彦军,孙冀,等.简化E.Coli觅食优化算法及其在非线性模型参数辨识中的应用[J].控制理论与应用,2007,24(6):991-994.
编辑刘冰 |