[1] GENG N,XIE X L,AUGUSTO V,et al.A monte carlo optimization and dynamic programming approach for managing MRI examinations of stroke patients[J].IEEE Transactions on Automatic Control,2011,56(11):2515-2529. [2] GENG N,XIE X L.Optimal dynamic outpatient scheduling for a diagnostic facility with two waiting time targets[J].IEEE Transactions on Automatic Control,2016,61(12):3725-3739. [3] BARON O,BERMAN O,KRASS D,et al.Strategic idleness and dynamic scheduling in an open-shop service network:case study and analysis[J].Manufacturing & Service Operations Management,2017,19(1):52-71. [4] 刘阳,耿娜.面向多检查的门诊患者调度研究[J].运筹与管理,2017,26(9):78-87. LIU Y,GENG N.Outpatient scheduling for multiple examinations[J].Operations Research and Management,2017,26(9):78-87.(in Chinese) [5] HU X F,WU H,ZHANG S M,et al.Scheduling outpatients in hospital examination departments[C]//Proceedings of IEEE International Conference on Industrial Engineering & Engineering Management.Washington D.C.,USA:IEEE Press,2010:631-646. [6] CHERN C C,CHIEN P S,CHEN S Y.A heuristic algorithm for the hospital health examination scheduling problem[J].European Journal of Operational Research,2008,186(3):1137-1157. [7] 杨湘龙,王飞,冯允成.仿真优化理论与方法综述[J].计算机仿真,2000,17(5):1-5. YANG X L,WANG F,FENG Y C.Overview of simulation optimization theory and methods[J].Computer Simulation,2000,17(5):1-5.(in Chinese) [8] LIU R,XIE X L,YU K,et al.A survey on simulation optimization for the manufacturing system operation[J].International Journal of Modelling and Simulation,2018,38(2):116-127. [9] HO Y C,SREENIVAS R S,VAKILI P.Ordinal optimization of DEDS[J].Discrete Event Dynamic Systems,1992,2(1):61-88. [10] SONG D P,HICKS C,EARL C F.An ordinal optimization-based evolution strategy to schedule complex make-to-order products[J].International Journal of Production Research,2006,44(22):4877-4895. [11] HORNG S C,LIN S S,YANG F Y.Evolutionary algorithm for stochastic job shop scheduling with random processing time[J].Expert Systems with Applications,2012,39(3):3603-3610. [12] YANG H A,LÜ Y,XIA C K,et al.Optimal computing budget allocation for ordinal optimization in solving stochastic job shop scheduling problems[J].Mathematical Problems in Engineering,2014(6):1-10. [13] 陈魁,毕利.考虑运输时间的多目标柔性作业车间调度研究[J].小型微型计算机系统,2021,42(5):946-952. CHEN K,BI L.Research on multi-objective flexible job shop scheduling considering transport time[J].Journal of Chinese Computer Systems,2021,42(5):946-952. (in Chinese) [14] ZHANG L Q,LU L F,YUAN J J.Two-machine open-shop scheduling with rejection to minimize the makespan[J].Or Spectrum,2016,38(2):1-11. [15] 朱光宇,贺利军.基于灰熵并行分析优化算法的多目标流水车间调度[J].计算机工程,2015,41(10):165-170. ZHU G Y,HE L J.Multi-objective flow shop scheduling based on gray entropy parallel analysis optimization algorithm[J].Computer Engineering,2015,41(10):165-170.(in Chinese) [16] CHENG M B,TADIKAMALLA P R,SHANG J,et al.Two-machine flow shop scheduling with deteriorating jobs:minimizing the weighted sum of makespan and total completion time[J].Journal of the Operational Research Society,2015,66(5):709-719. [17] YAZDANI M,ALETI A,KHALILI S M,et al.Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem[J].Computers & Industrial Engineering,2017,107(5):12-24. [18] SUN J,LIN Q,ZHAO P,et al.Reducing waiting time and raising outpatient satisfaction in a Chinese public tertiary general hospital-an interrupted time series study[J].BMC Public Health,2017,17(1):668. [19] WEN J,GENG N,XIE X L.Real-time scheduling of semi-urgent patients under waiting time targets[J].International Journal of Production Research,2020,58(4):1127-1143. [20] AZADEH A,FARAHANI M H,TORABZADEH S,et al.Scheduling prioritized patients in emergency department laboratories[J].Computer Methods and Programs in Biomedicine,2014,117(2):61-70. [21] PALACIOS J J,PUENTW J,VELA C R,et al.A genetic algorithm for the open shop problem with uncertain durations[C]//Proceedings of International Conference on the Interplay Between Natural and Artificial Computation.Washington D.C.,USA:IEEE Press,2009:255-264. |