Abstract:
To raise the chip yield and on-time-delivery rate so as to promote the competitive ability of the chip producers, a multi-agent technology based dynamic schedule algorithm of semiconductor fabrication line is proposed. To optimize the schedule system, the machining center agents cooperate with each other, both up and down stream information is taken into consideration when scheduling. The validity of this algorithm is demonstrated by simulation.
Key words:
semiconductor fabrication line,
schedule,
multi-agent system
摘要: 以提高芯片生产厂家的市场竞争力、芯片合格率和按期交货率为主要调度目标,该文提出了基于多agent技术的半导体生产线动态调度算法,各加工中心agent相互合作,调度时协同考虑上下游加工中心的信息,共同满足优化调度的目的,仿真实验证明了算法的有效性。
关键词:
半导体生产线,
调度,
多agent系统
CLC Number:
WANG Lingqun; ; LU Xiaofang; ; ZHENG Yingping;. Research on Dynamic Schedule of Semiconductor Fabrication Line Based on Multi-agent Technology[J]. Computer Engineering, 2007, 33(13): 4-6.
王令群; ;陆小芳; ;郑应平;. 基于多Agent技术的半导体生产线动态调度研究[J]. 计算机工程, 2007, 33(13): 4-6.