CMMI-based Resource Model

WANG Hui, ZHOU Bo-sheng   

  1. (School of Computer Science and Technology, Beihang University, Beijing 100083)
  • Received:1900-01-01 Revised:1900-01-01 Online:2007-10-05 Published:2007-10-05

基于CMMI的资源模型

王 慧,周伯生   

  1. (北京航空航天大学计算机学院,北京 100083)

Abstract: Based on the useful, true, timely and reasonable software metrics, this paper builds the project resource model during CMMI performance. When plenty of resources data are collected during the improvement of organization’s level of capability maturity, based on the resource model of completed projects, projects resources data can be incorporated and organization resource model can be built by using the equivalent class partition technique based on clustering. Correct resource model can be used to plan, predict, monitor and control project resources quantitatively and efficiently.

Key words: resource model, capability maturity model integration(CMMI), GQM

摘要: 在CMMI实施过程中,以有效、真实、及时、合理的度量数据为基础建立了项目的资源模型。随着组织成熟度的提高和项目数据的积累,在已经完成的项目基础上,按照聚类的思想选择相似的项目组,执行资源模型合并的算法,建立组织的资源模型。正确地建立并使用资源模型对有效策划、预测、监督和控制项目的资源有显著的作用。

关键词: 资源模型, 能力成熟度模型集成, GQM