[1] ALLEN J F.Towards a general theory of action and time[J].Artificial Intelligence,1984,23(2):123-154. [2] NEUMANN K,SCHWINDT C.Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production[J].Operation Research Spectrum,1997,19(3):205-217. [3] DOUGLAS III E E,CALVEY T T,MCDONALD J D F,et al.The great negative lag debate[EB/OL].[2019-03-01].https://search.proquest.com/openview/8ee53988bf6aa74b6dd01990bab3d782/1?pq-origsite=gscholar&cbl=27161. [4] ECHEVERRY D,IBBS C W,KIM S.Sequencing knowledge for construction scheduling[J].Journal of Construction Engineering and Management,1991,117(1):118-130. [5] SONG Y,CHUA D K H.Modeling of functional construction requirements for constructability analysis[J].Journal of Construction Engineering and Management,2006,132(12):1314-1326. [6] CHUA D K H,YEOH K W.PDM++:a planning framework from construction requirements perspective[J].ASCE Journal of Construction Engineering and Management,2011,137(4):266-274. [7] FAN Chenhao,SONG Yuanbin,PEI Qi.Project schedule with alternative activities and relationships[J].Journal of Engineering Research,2017,5(3):30-49. [8] LORTERAPONG P,USSAVADILOKRIT M.Con-struction scheduling using the constraint satisfaction problem method[J].Journal of Construction Engineering and Management,2013,139(4):414-422. [9] KAIAFA S,CHASSIAKOS A P.A genetic algorithm for optimal resource-driven project scheduling[J].Procedia Engineering,2015,123:260-267. [10] NGUYEN T Q,CHUA D K H.Preemptive constraint analysis in construction schedules[J].Journal of Computing in Civil Engineering,2015,29(5):4062-4068. [11] CHENG Yaohua,ZHANG Ning,KANG Chongqing,et al.Low carbon transmission expansion planning considering dem and side management[J].Automation of Electric Power Systems,2016,40(23):67-75.(in Chinese)程耀华,张宁,康重庆,等.考虑需求侧管理的低碳电网规划[J].电力系统自动化,2016,40(23):67-75. [12] OUYANG Chao,CHEN Zhibo,SUN Guodong.Improved genetic algorithm for Web service composition QoS optimization[J].Computer Engineering,2017,43(8):231-235,242.(in Chinese)欧阳超,陈志泊,孙国栋.Web服务组合QoS优化中的改进遗传算法[J].计算机工程,2017,43(8):231-235,242. [13] ZHANG Zonghua,ZHAO Jingxiang,LU Xiang,et al.Application of BP neural network based on genetic algorithm in power load forecasting[J].Computer Engineering,2017,43(10):277-282,288.(in Chinese)张宗华,赵京湘,卢享,等.基于遗传算法的BP神经网络在电力负载预测中的应用[J].计算机工程,2017,43(10):277-282,288. [14] FENG C W,LIU L,BURNS S A.Using genetic algorithms to solve construction time-cost trade-off problems[J].Journal of Computing in Civil Engineering,1997,11(3):184-189. [15] LU Shen,LIU Min,WU Cheng,et al.Genetic algorithm for construction project scheduling problem with flow processes[J].Control Engineering of China,2005,12(1):11-14.(in Chinese)路深,刘民,吴澄,等.带流水作业工程项目调度问题的遗传算法[J].控制工程,2005,12(1):11-14. [16] ELRAYES K,KANDIL A.Time-cost-quality trade-off analysis for highway construction[J].Journal of Construction Engineering and Management,2005,131(4):477-486. [17] LEU S S,YANG C H.GA-based multicriteria optimal model for construction scheduling[J].Journal of Construction Engineering and Management,1999,125(6):420-427. [18] LEE J,HYUN H.Multiple modular building construction project scheduling using genetic algorithms[J].Journal of Construction Engineering and Management,2019,145(1). [19] FENG Jianrong,LIU Zhihe,LIU Zhenghe.A mixed integer genetic algorithms for solving the mixed integer programming problems and simulation implementing[J].Journal of System Simulation,2004,16(4):845-848.(in Chinese)丰建荣,刘志河,刘正和.混合整数规划问题遗传算法的研究及仿真实现[J].系统仿真学报,2004,16(4):845-848. [20] LONG L D,OHSATO A.A genetic algorithm-based method for scheduling repetitive construction projects[J].Automation in Construction,2009,18(4):499-511. [21] LIN L,HAO X C,GEN M,et al.Network modeling and evolutionary optimization for scheduling in manu-facturing[J].Journal of Intelligent Manufacturing,2012,23(6):2237-2253. [22] AZARON A,PERKGOZ C,SAKAWA M.A genetic algorithm approach for the time-cost trade-off in PERT networks[J].Applied Mathematics and Computation,2007,168(2):1317-1339. |